Matters needing attention in engine assembly?




Before assembling the engine, all parts, assemblies, lubricating oil circuit and tool d workbench should be thoroughly cleaned and dried with compressed air. Before assembling, check all bolts and nuts, and replace those that do not meet the requirements; cylinder gaskets, gaskets, split pins, lock plates, locking wires, washers, etc., should be replaced during overhaul.
Navigation